当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The Power Plant will be designed to operate continuously for 24 hours per day throughout the year with the power plant running at or near full load according to the power system load demand. The operating concept will be based on a central control room with a modern control system for all normal plant operations. Start是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Power Plant will be designed to operate continuously for 24 hours per day throughout the year with the power plant running at or near full load according to the power system load demand. The operating concept will be based on a central control room with a modern control system for all normal plant operations. Start
问题补充:

  • 匿名
2013-05-23 12:21:38
  • 匿名
2013-05-23 12:23:18
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭