当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The construction theory is driving a casing pipe based in design depth and gap distance to form pipes, sinking the sand into reserved ungerground depth from the bottom with valve tube boots, pressing sand from bottom valve and replenish unceasingly until sand drain is formed.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The construction theory is driving a casing pipe based in design depth and gap distance to form pipes, sinking the sand into reserved ungerground depth from the bottom with valve tube boots, pressing sand from bottom valve and replenish unceasingly until sand drain is formed.
问题补充:

  • 匿名
2013-05-23 12:21:38
建设理论驾驶套管形成管道的设计深度和间隙距离的沙子从底部阀门管靴,下沉将保留ungerground深度的,按从沙底阀,并不断补充,直到形成砂井。
  • 匿名
2013-05-23 12:23:18
建筑理论是基于驾驶一个套管的设计深度和距离,形成管道,沉没到保留的沙子ungerground深度从底部启动时与阀管,按下沙从底部阀门和补充不断直到沙排放就形成了。
  • 匿名
2013-05-23 12:24:58
建筑理论驾驶设计深度和空白距离根据的框管子到形式管子,下沉沙子入后备的ungerground深度从底部与阀门管起动,按沙子从底下阀门并且不断地重新补充,直到排水砂桩被形成。
  • 匿名
2013-05-23 12:26:38
建设理论驾驶设在管道,沉入保留的 ungerground 深度的沙子从底部与阀门管压砂从底阀的靴子和不断补充,直至组建砂井设计深度和间隙距离的套管。
  • 匿名
2013-05-23 12:28:18
建造理论在弄得一只 casing 烟斗位于设计深度和缺乏形成烟斗,到来自有阀门管子的底部的保留的 ungerground 深度中使沙下沉的距离引导,按沙最后的阀门和 unceasingly 被装满直到沙排水被形成。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭