当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:压裂井筛选与设计的时间点需结合UEPL提供数据的时间来确定是什么意思?

待解决 悬赏分:1 - 离问题结束还有
压裂井筛选与设计的时间点需结合UEPL提供数据的时间来确定
问题补充:

  • 匿名
2013-05-23 12:21:38
Fractured wells screening and design point in time requires a combination of uepl the time of the data to determine
  • 匿名
2013-05-23 12:23:18
fracturing wells with the design of the filter point in time to provide the data UEPL combined with the time to determine if
  • 匿名
2013-05-23 12:24:58
Compression fracture well screening and the design time spot must unify UEPL to provide the data the time to determine
  • 匿名
2013-05-23 12:26:38
Fractured well filter UEPL in combination with design time required to provide data to determine
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭