当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Libeskind's design included a hanging garden,a memorial,a cultural center and Freedom Tower.The tower is now planned to cost $2 billion,and be ready for use in 2011.The memorial plans were rederigned in June,2006. Its construction began in 2006 and the memorial is scheduled to open on Sept.11,2009.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Libeskind's design included a hanging garden,a memorial,a cultural center and Freedom Tower.The tower is now planned to cost $2 billion,and be ready for use in 2011.The memorial plans were rederigned in June,2006. Its construction began in 2006 and the memorial is scheduled to open on Sept.11,2009.
问题补充:

  • 匿名
2013-05-23 12:21:38
里伯斯金的设计包括一个空中花园,纪念馆,文化中心和自由塔。塔现计划耗资2亿美元,并准备在使用2011.the纪念馆计划在6月rederigned,2006。它的建设开始于2006年和纪念馆定于2009年9月11日,打开。
  • 匿名
2013-05-23 12:23:18
遗址的设计包括一个挂花园、一个纪念,一个文化中心,自由塔。目前正计划成本的塔式20亿美元,并已准备就绪,可以使用在2011年.在june,2006rederigned纪念计划。 在2006年开始建造的,其将于9月纪念11,2009。
  • 匿名
2013-05-23 12:24:58
Libeskind的设计包括一个斜坡上的花园,纪念品,一个文化中心和自由Tower.The塔在2006年6月现在计划花费$2十亿,并且是即可用在2011.The纪念计划是rederigned。 2006年它的建筑开始了,并且在Sept.11预定纪念品开始2009年。
  • 匿名
2013-05-23 12:26:38
伯斯金的设计包括悬挂花园、 纪念、 文化的中心和自由 Tower.The 塔现在计划耗资 2 亿元和准备使用的 2011.The 纪念计划在 2006 年 6 月被 rederigned。2006 年已经开始建造,纪念馆定于在 Sept.11,2009 上打开。
  • 匿名
2013-05-23 12:28:18
Libeskind 的设计包括一座空中花园,一所纪念馆,一座文化中心和自由 Tower.The 塔现在被计划花费二十亿美元,在 2011.The 纪念馆中是准备就绪的制定计划被 rederigned 在 2006 年 6 月中。其建造在 2006 年开始和纪念
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭