当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:1.经确认不良为2012.02.09日生产部生产时贴装零件至最后一连片(42小片)时,因该位置电感卷带贴完欠料,将该1PANEL隔离放置,未检AOI。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
1.经确认不良为2012.02.09日生产部生产时贴装零件至最后一连片(42小片)时,因该位置电感卷带贴完欠料,将该1PANEL隔离放置,未检AOI。
问题补充:

  • 匿名
2013-05-23 12:21:38
Identified adverse 2012.02.09 day production department production mount parts to last a contiguous (42 tablets), less expected, the inductance of the location of the tape had finished the 1panel isolated place, not seized aoi.
  • 匿名
2013-05-23 12:23:18
1.It has been confirmed negative for production of 012.02 on .09 when production-mount part to the last ridge (42 pieces), inductive volume for this position with the fit, place the 1 isolation PANEL AOI has not been retrieved.
  • 匿名
2013-05-23 12:24:58
When 1. passes through the confirmation not not good is 2012.02.09 dates produce department when production pastes installs the components to last Lian Pian (42 small pieces), because this position inductance volume belt pastes owes the material, this 1PANEL isolation laying aside, has not examined
  • 匿名
2013-05-23 12:26:38
1. bad confirmed for 2012.02.09th production mount when parts of production to final (42 small pieces), finished the inductor volume posted due to the material, the 1PANEL isolated place, not liable to AOI.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 