当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:基槽开挖后,施工基础前,承包人应通知工程师会同有关部门检验持力层。经检验符合设计要求后,才可进行下一工序的施工。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
基槽开挖后,施工基础前,承包人应通知工程师会同有关部门检验持力层。经检验符合设计要求后,才可进行下一工序的施工。
问题补充:

  • 匿名
2013-05-23 12:21:38
Foundation trench excavation, construction of the basis, the Contractor shall notify the Engineer in conjunction with relevant departments to test the bearing stratum. Inspection meet the design requirements only after the construction of the next process.
  • 匿名
2013-05-23 12:23:18
Base slot after excavation, construction, and the contractor before basis should be notified in conjunction with the relevant government department engineers testing a layer. After inspection, compliance with design requirements can only be for the next operation of construction.
  • 匿名
2013-05-23 12:24:58
After the foundation trench excavates, in front of the construction foundation, the contractor should inform engineer to handle jointly with the department concerned examination to hold the strength level.Conforms to the design requirement after the examination, only then may carry on the next worki
  • 匿名
2013-05-23 12:26:38
After the Foundation trench excavation, before the foundation of construction, the contractor shall notify the engineer inspection capacity in conjunction with the departments concerned. After the design has been tested in accordance with requirements, in order to conduct the next process of constru
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭