当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:如果超挖,应采用施工图纸中要求的回填材料进行回填,并且压实到指定的密实度。因超挖而增加的费用,应由承包人自理。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
如果超挖,应采用施工图纸中要求的回填材料进行回填,并且压实到指定的密实度。因超挖而增加的费用,应由承包人自理。
问题补充:

  • 匿名
2013-05-23 12:21:38
Overbreak, the backfill material required in the construction drawings should be used for backfill and compaction to specified density. Increased costs due to over-excavation, should the contractor take care of themselves.
  • 匿名
2013-05-23 12:23:18
If the timeout should be used, and construction drawings in the backfill material for backfill and compaction, and to a given density. He dug for the increased costs to be borne by contractor at their own expense.
  • 匿名
2013-05-23 12:24:58
If ultra digs, should use the backfill material which in the construction blueprint requests to carry on the backfill, and the compaction to compactness which assigns.Because ultra digs the expense which increases, should take care of oneself by the contractor.
  • 匿名
2013-05-23 12:26:38
If the Super dug, should be used to backfill request backfill material in construction drawings, and density of compacted to specified. Increase in costs due to drilling, contractors should take care.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭