求翻译:振捣和浇筑位置应事先设计好,并且振捣位置距浇筑点不超过1.5m是什么意思?

待解决 悬赏分:1 - 离问题结束还有
振捣和浇筑位置应事先设计好,并且振捣位置距浇筑点不超过1.5m
问题补充:

  • 匿名
2013-05-23 12:21:38
Vibrators and the pouring position should be designed well in advance, and the vibrator position away from the pouring point does not exceed 1.5m
  • 匿名
2013-05-23 12:23:18
The location should be poured in and advance design is good, and the poured in place is not more than 1.5M
  • 匿名
2013-05-23 12:24:58
Inspires pounds and constructs the position to be supposed to design beforehand, and inspires pounds the position to be apart from construction not to surpass 1.5m
  • 匿名
2013-05-23 12:26:38
Vibration and placement locations should be designed well in advance, and vibrating from the pour point is not more than 1.5m