求翻译:本文仅考虑备用的数量,不考虑备用的来源,切负荷赔偿费用也计入备用成本,算例先采用标准测试系统的机组带基本负荷,其中不含风电机组。在市场环境下,考虑负荷预测误差和机组事故,综合考虑保留备用容量成本和切负荷成本,求取经济上最小的备用成本。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本文仅考虑备用的数量,不考虑备用的来源,切负荷赔偿费用也计入备用成本,算例先采用标准测试系统的机组带基本负荷,其中不含风电机组。在市场环境下,考虑负荷预测误差和机组事故,综合考虑保留备用容量成本和切负荷成本,求取经济上最小的备用成本。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
This article is only taking into account the number of the spare, and does not take into account all sources, and load compensation costs are also counted in the alternative cost, first with the standard examples of unit test system with base load, it does not contain air motor assembly. In a market
  • 匿名
2013-05-23 12:24:58
This article only considered the spare quantity, did not consider the spare origin, cuts the load compensation expense also to include the spare cost, the example uses the standard test system first the unit belt basic load, in which does not contain the wind electrical machinery.Under the market en
  • 匿名
2013-05-23 12:26:38
This article considers only an alternate number, does not consider an alternate source, load compensation costs are also included in the standby costs, examples for the use of standard units with basic load testing system, which does not contain a wind turbine. In a market environment, considering l
  • 匿名
2013-05-23 12:28:18