当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The land designated for the Olympic Park (more than 230 hectares) occupies around one fifth of the whole Lower Lea Valley regeneration zone and flanks a two kilometre stretch of the River Lea. In addition to having the river at its heart, the site incorporated a network of canals and a tangle of infrastructure includin是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The land designated for the Olympic Park (more than 230 hectares) occupies around one fifth of the whole Lower Lea Valley regeneration zone and flanks a two kilometre stretch of the River Lea. In addition to having the river at its heart, the site incorporated a network of canals and a tangle of infrastructure includin
问题补充:

  • 匿名
2013-05-23 12:21:38
指定为奥林匹克公园(230多公顷)的土地占整个LEA山谷再生区和侧翼的Lea河两公里长的五分之一左右。除了在其心中的河中,该网站成立的运河和缠结的基础设施,包括塔,道路,下水道和铁路网络。
  • 匿名
2013-05-23 12:23:18
指定的土地为奥林匹克公园(超过230公顷)占据五分之一左右整个下层lea谷再生区和南北两翼的两公里长的河lea。 此外,在该河在其心,该站点包含一个网络的运河和一堆乱七八糟的基础架构,包括高压输电线铁塔、道路、污水渠和铁路。
  • 匿名
2013-05-23 12:24:58
奥林匹克公园选定的土地(超过230公顷)占领整体更低的Lea谷再生区域的大约五分之一并且侧河Lea的二公里舒展。 除有之外河在它的心脏,站点合并了运河网络和基础设施缠结包括定向塔、路、下水道和路轨。
  • 匿名
2013-05-23 12:26:38
指定为奥林匹克公园 (超过 230 公顷) 的土地占地大约五分之一的低山谷再生整个区域,沿着河 Lea 两公里河段。除了要有这条河的核心,在网站纳入缠在一起的基础设施,包括主塔、 道路、 下水道和铁路和运河的网络。
  • 匿名
2013-05-23 12:28:18
陆地为奥林匹克公园指定 ( 超过 230 公顷 ) 占
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭