当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在建工程按实际发生的支出入账,并在达到预定可使用状态时,按工程的实际成本确认为固定资产。每年末报告期终了,对在建工程进行全面检查,如果有证据表明在建工程已经发生了减值,则计提减值准备,计入当期损益。在建工程减值准备按单项资产计提。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在建工程按实际发生的支出入账,并在达到预定可使用状态时,按工程的实际成本确认为固定资产。每年末报告期终了,对在建工程进行全面检查,如果有证据表明在建工程已经发生了减值,则计提减值准备,计入当期损益。在建工程减值准备按单项资产计提。
问题补充:

  • 匿名
2013-05-23 12:21:38
Construction in progress are stated at actual cost, and achieve the intended use, the actual cost of the project is recognized as fixed assets. End of each year, the end of the reporting period, to conduct a comprehensive inspection of construction in progress, if there is evidence that the construc
  • 匿名
2013-05-23 12:23:18
In the actual construction of the expenditure into the account, and the State has reached a predetermined time, you can use the actual cost for fixed assets. Each year, the end of the period reported on the construction, if there is evidence to suggest that there has been a construction project, the
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
Construction according to the actual expenditures recorded at, and used for its intended State, according to the actual cost of engineering recognized as fixed assets. At the end of each reporting period ending, thorough checking of project under construction, if there is evidence that construction
  • 匿名
2013-05-23 12:28:18
In constructs the project according to the disbursement which occurs actually to deposit, and in achieved when predetermined may the running condition, confirms according to the project actual cost for the fixed asset.Each year's end current period end, to has been constructing the project to carry
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭