当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:寸滩作业区三期工程实施后,三峡水库运行5年和10年工程河段泥沙累积淤积量和淤积速率统计于表3中。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
寸滩作业区三期工程实施后,三峡水库运行5年和10年工程河段泥沙累积淤积量和淤积速率统计于表3中。
问题补充:

  • 匿名
2013-05-23 12:21:38
The Cuntan operation area three project, the Three Gorges Reservoir 5 years and 10 years of river sediment accumulated siltation and siltation rate statistics in Table 3.
  • 匿名
2013-05-23 12:23:18
Inch beach area after the implementation phase of the project 3, and 3 Gorges dam run for 5 years and 10 years of engineering River silt accumulated sludge volume and sludge rate statistics in table 3.
  • 匿名
2013-05-23 12:24:58
After the inch beach operation area three issue of project implementations, the Three Gorges reservoir moves 5 year and 10 year project section of river silt accumulation silting-up rate and the siltation speed statistics in table 3.
  • 匿名
2013-05-23 12:26:38
Cuntan area after the implementation of the three-phase project, run for 5 years, and 10 engineering reach of three Gorges reservoir accumulation of sediment siltation and sedimentation rates in the statistics in table 3.
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭