当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在建设项目施工阶段运用BIM 所带来的风险主要有: 从建模角度来看, 可能由于建模过程中的错误或信息丢失带来风险;是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在建设项目施工阶段运用BIM 所带来的风险主要有: 从建模角度来看, 可能由于建模过程中的错误或信息丢失带来风险;
问题补充:

  • 匿名
2013-05-23 12:21:38
Use in the construction stage the risks brought about by bim are: From the modeling point of view, the risks may be due to errors in the modeling process or loss of information;
  • 匿名
2013-05-23 12:23:18
Construction work on the project in phase with the risk associated with BIM: from the modeling point of view, as a result of the modeling process error or loss of information risk.
  • 匿名
2013-05-23 12:24:58
Utilizes the risk in the items of basic construction construction stage which BIM brings mainly to have: Looked from the modelling angle, possible because in the modelling process mistake or the information loss brings the risk;
  • 匿名
2013-05-23 12:26:38
During the project construction phase risks arising from the use of BIM are: from a modeling perspective, possibly due to mistake in modeling pose a risk or loss of information;
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭