当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The protection was put into test operation in 500 KV liaoyang Substation and on 220KV Liao River line in Aug.1986. It is the earliest high-voltage complete set of microprocessor protection in our country .There has not occurred any internal fault on Liao River line for year since the protection was put into test operat是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The protection was put into test operation in 500 KV liaoyang Substation and on 220KV Liao River line in Aug.1986. It is the earliest high-voltage complete set of microprocessor protection in our country .There has not occurred any internal fault on Liao River line for year since the protection was put into test operat
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
保护被放在测试操作在500kv变电站和辽阳廖河220kv线路在1986年8月。 它是最早高电压保护完整的一套在我国的微处理器.没有发生内部故障任何廖河行自保护是每年投入试运行中。 在外部故障和系统测试,操作说明,并记录波形高达40次,其中37次完整波形记录保存。
  • 匿名
2013-05-23 12:24:58
保护被放入测试操作在500千伏辽阳分站和在220KV Liao河线在Aug.1986。 它是微处理器保护最早期的高压完整集在我们的国家。自从保护被放入测试操作,那里在Liao河线未发生任何内部缺点年。 在外在缺点和系统试验期间,操作陈述了并且记录了信号波形40次,其中被保留的37次完成信号波形纪录。 阶段外在缺点纪录由保护是根本上正确的。 在外在缺点19个盒, 18个仅盒BC正确地被记录了,但为1个案件外部接地故障,被记录了作为阶段B接地故障。
  • 匿名
2013-05-23 12:26:38
保护被投入测试运行在辽阳 500KV 变电站和 220KV 辽河行在 Aug.1986 中。它是最早高电压成套的微机保护在我国。那里没有辽河行上的任何内部故障年以来所发生保护投入试运行。在外部故障和系统测试中,该操作表示和记录的波形达 40 倍,其中 37 倍保持完整的波形记录。由保护外部故障记录的阶段是从根本上正确。在外部故障的 19 例,18 例录得正确,但仅 1 例为外部的 BC 接地故障,录得作为 B 单相接地故障。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭