当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:4.4.1审查中先由飞机工程部确定的项目负责人进行详细技术性介绍,向审查组介绍以下内容:是什么意思?

待解决 悬赏分:1 - 离问题结束还有
4.4.1审查中先由飞机工程部确定的项目负责人进行详细技术性介绍,向审查组介绍以下内容:
问题补充:

  • 匿名
2013-05-23 12:21:38
The person in charge of the projects identified in the first Department of Aircraft Engineering 4.4.1 review detailed technical presentations to the review group on the following:
  • 匿名
2013-05-23 12:23:18
  • 匿名
2013-05-23 12:24:58
In 4.4.1 examinations first the project person in charge who determined by the airplane engineering dept carries on the detailed technical nature to introduce that, introduces following content to the examination group:
  • 匿名
2013-05-23 12:26:38
4.4.1 review first determined by the aircraft engineering project manager for detailed technical presentations, introduction to a review group to the following:
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭