当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:当进入机器的压力达到工作的压力并无气泡喷出,将变速杆置于适当的回收档位,调整速度控制手柄的位置,是什么意思?

待解决 悬赏分:1 - 离问题结束还有
当进入机器的压力达到工作的压力并无气泡喷出,将变速杆置于适当的回收档位,调整速度控制手柄的位置,
问题补充:

  • 匿名
2013-05-23 12:21:38
When the pressure reaches the pressure of work into the machine does not have air bubbles ejected, the shift lever is placed in the appropriate recycling stalls, adjust the speed control handle position,
  • 匿名
2013-05-23 12:23:18
When the pressure in the machine to work the pressure and spray, bubble-free will be placed in the appropriate shift lever of the recovery gear, adjusting the speed control the position of the handle.
  • 匿名
2013-05-23 12:24:58
When enters the machine the pressure to achieve the work the pressure and the non-air bubble blowout, puts in suitably the gearshift lever returns to closes up shop the position, the governed speed controls the handle the position,
  • 匿名
2013-05-23 12:26:38
When entering the work pressure is the pressure of the machine and no bubbles out, variable speed lever to the right of the recovery stalls, adjust the speed control handle locations
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭