当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:In the operative planning, the timetables are the basis from which vehicle schedules and crew schedules are created. Except from these scheduling problems the operative planning also includes a number of ”what-if problems”. This is a class of problems that always can occur and that demand fast solutions. Examples of th是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In the operative planning, the timetables are the basis from which vehicle schedules and crew schedules are created. Except from these scheduling problems the operative planning also includes a number of ”what-if problems”. This is a class of problems that always can occur and that demand fast solutions. Examples of th
问题补充:

  • 匿名
2013-05-23 12:21:38
在执行规划的时间表是从车辆调度和船员的时间表创建的基础。除了这些调度问题的执行规划还包括一些“假设问题”。这是一类的,总是能出现的问题和需求的快速解决方案。这类问题的例子,什么应做,如果车辆发生故障或司机如果在生病呢?的整个规划过程更详细的流程图,包括输入和输出,对应不同的步骤,可以发现在塞德(2003年)。为进一步在2.3章描述的需求响应服务,也有分配客运车辆的请求的其他问题。
  • 匿名
2013-05-23 12:23:18
在规划的执行部分,这些时间表的基础上,从车辆计划日程表的创建和机组人员。 除了这些计划的执行部分问题计划中还包括一些“什么的如果出现问题"。 这是一个类可能会发生的问题,一直以来,这种新的需求快速解决方案。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
在手术规划时间表是其中汽车从创建时间表和船员时间表的基础。除了从这些调度问题手术规划还包括大量的"假设"的问题
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭