当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:D. Where variance occurs between drawings and Specifications, or within either document itself, the items or arrangement of better quality, greater quantity, or higher cost shall be included in the contract price. The Contractor shall request clarification in writing from the Engineer on which item and manner in which是什么意思?

待解决 悬赏分:1 - 离问题结束还有
D. Where variance occurs between drawings and Specifications, or within either document itself, the items or arrangement of better quality, greater quantity, or higher cost shall be included in the contract price. The Contractor shall request clarification in writing from the Engineer on which item and manner in which
问题补充:

  • 匿名
2013-05-23 12:21:38
D。图纸和规格之间的差异,或在任何文件本身出现的地方,安排的项目或质量更好,更大的数量,或更高的成本应包括在合同价格。承包人应当在工作项目和方式应安装工程师的书面请求作出澄清。
  • 匿名
2013-05-23 12:23:18
d.*在图纸和技术要求之间出现差异,或在任一文档本身,这些项目或安排更好的质量、更多数量的水份,或更高的成本应包含在合同价款。 承包者应以书面形式提出的澄清要求的项目工程师的工作,应安装。
  • 匿名
2013-05-23 12:24:58
D. 那里变化发生在图画和规格之间,或者在更好质量、更加了不起的数量或者更高的费用的文件,项目或安排之内在合同价格将包括。 承包商将请求阐明以书面方式从项目和方式工作将安装的工程师。
  • 匿名
2013-05-23 12:26:38
D.凡方差发生之间图纸和规格,或内任一文档本身、 项目或质量更好的安排,须在合同价格包括更大数量或更高的成本。承建商不得请求书面澄清关于哪些项目和方式须安装工作的工程师。
  • 匿名
2013-05-23 12:28:18
D.哪里差异在每份文件本身中的素描和规格之间出现,更好高级,更大的数量,或更高的费用的条款或%E
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭