求翻译:Many turbines have capacities of 3 or 4 megawatts, so you can assume that each megawatt of wind capacity requires roughly 50 tons of steel. By contrast, a typical natural gas turbine can produce nearly 43 megawatts while weighing only 9 tons. Thus, each megawatt of capacity requires less than a quarter of a ton of stee是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Many turbines have capacities of 3 or 4 megawatts, so you can assume that each megawatt of wind capacity requires roughly 50 tons of steel. By contrast, a typical natural gas turbine can produce nearly 43 megawatts while weighing only 9 tons. Thus, each megawatt of capacity requires less than a quarter of a ton of stee
问题补充:

  • 匿名
2013-05-23 12:21:38
许多发电机组有3或4兆瓦的能力,所以你可以假设每兆瓦的风力发电容量大约需要50万吨钢材。相比之下,一个典型的天然气涡轮机可产生近43兆瓦,而仅重9吨。因此,每兆瓦容量需要不到一吨钢铁的四分之一%
  • 匿名
2013-05-23 12:23:18
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭