当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Consider the massive quantities of steel required for wind projects. The production and transportation of steel are both expensive and energy-intensive, and installing a single wind turbine requires about 200 tons of it.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Consider the massive quantities of steel required for wind projects. The production and transportation of steel are both expensive and energy-intensive, and installing a single wind turbine requires about 200 tons of it.
问题补充:

  • 匿名
2013-05-23 12:21:38
考虑大规模的风力发电项目所需的钢材数量。钢的生产和运输都是昂贵和能源密集型,和一个单一的风力发电机组的安装需要约200万吨。
  • 匿名
2013-05-23 12:23:18
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭