当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:施工准备、施工方法、施工质量控制加固处理是淤地坝施工的关键环节,从这几方面阐述了黄土高原地区水土保持淤地坝的一般方法和原理以及工程实践现状是什么意思?

待解决 悬赏分:1 - 离问题结束还有
施工准备、施工方法、施工质量控制加固处理是淤地坝施工的关键环节,从这几方面阐述了黄土高原地区水土保持淤地坝的一般方法和原理以及工程实践现状
问题补充:

  • 匿名
2013-05-23 12:21:38
Construction preparation, construction method, construction quality control of reinforcement processing is a key part of warping dam construction, described from several general methods and principles of the Loess Plateau of siltation dam engineering practice status
  • 匿名
2013-05-23 12:23:18
Construction preparation, methods of construction, construction quality control process is reinforced with blockage as well as key elements of the construction from the Loess Plateau region of the State soil and water conservation as well as blockage to the general method and theory as well as curre
  • 匿名
2013-05-23 12:24:58
The construction preparation, the job practice, construction quality control reinforcement processing is the silt arrester construction key link, elaborated the loess plateau area conservation of water and soil silt arrester general method and the principle as well as the project practice present si
  • 匿名
2013-05-23 12:26:38
Construction quality control of construction preparation, construction methods, reinforcement is the key link of warping dam construction, from this paper deals with the General method of warping dams in the area of soil and water conservation on the loess plateau and present situation of principle
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭