当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:If based on the above delivery planning from Nictron China, I foresee Prometeo (147192010) will line down at Electrolux on 4th May 2012. Meanwhile, GP09 models also will facing the same issue as only 1 model W8.2696 = 520pcs can ship out from now until 3rd week of May? The schedule only concentrate on dryer which custo是什么意思?

待解决 悬赏分:1 - 离问题结束还有
If based on the above delivery planning from Nictron China, I foresee Prometeo (147192010) will line down at Electrolux on 4th May 2012. Meanwhile, GP09 models also will facing the same issue as only 1 model W8.2696 = 520pcs can ship out from now until 3rd week of May? The schedule only concentrate on dryer which custo
问题补充:

  • 匿名
2013-05-23 12:21:38
如果从上述nictron中国交付规划的基础上,我预见prometeo(147192010)将下移一行2012年5月4日在伊莱克斯。同时,gp09型号也将面临同样的问题,只有1模型w8.2696 = 520pcs可以从现在开始出货,直到5月3日的一周?时间表只专注于烘干机追逐的顾客。我认为V-ZUG与伊莱克斯将坐在我们的办公室,再次按期交货,如果没有改善。我已喜光为prometeo的每周需求和短缺每周通过电子邮件。
  • 匿名
2013-05-23 12:23:18
如果根据上述交付计划从nictron中国,我预见prometeo( 147192010) 将下一行在伊莱克斯2012年5月4。 另外,gp09型号还会面临同一问题,只有1个型号: w8.2696 =520pc出货从现在起一直到5月的第三周呢? 该计划只集中于客户追逐的干燥机。 我觉得v楚格和伊莱克斯将再次坐在我们的办公室如果交货日程安排未有改善。
  • 匿名
2013-05-23 12:24:58
  • 匿名
2013-05-23 12:26:38
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭