当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:7 上部锥体(序号01)和塔体(序号3)现场安装时,在螺栓,螺母和垫圈紧固是什么意思?

待解决 悬赏分:1 - 离问题结束还有
7 上部锥体(序号01)和塔体(序号3)现场安装时,在螺栓,螺母和垫圈紧固
问题补充:

  • 匿名
2013-05-23 12:21:38
7 the upper cone (No. 01) and tower (No. 3) on-site installation, the bolt, nut and washer fastening
  • 匿名
2013-05-23 12:23:18
Upper cone 7 (serial number 01) and Tower (number 3) On-site installation, bolts, nuts and washers, fasteners
  • 匿名
2013-05-23 12:24:58
When 7 upside cones (serial number 01) and the tower body (serial number 3) the scene installs, in the bolt, the nut and the gasket is tight
  • 匿名
2013-05-23 12:26:38
7 upper Cone (serial number 01) and Tower (number 3) site installation, the bolts, nuts and washers for fastening
  • 匿名
2013-05-23 12:28:18
7 upper cones (serial number 01) and when the body of tower (serial number 3) is installed live, in the bolt, nut and washer are fastened
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭