当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:上述基本规律说明,以排泥水浊度由迅速变化到较为平稳的转折点作为排泥结束点是经济的(实际运行中考虑安全因素适当加安全余量),可以建立原水浊度~排泥历时关系曲线,根据不同的原水浊度按相应的排泥历时控制排泥是什么意思?

待解决 悬赏分:1 - 离问题结束还有
上述基本规律说明,以排泥水浊度由迅速变化到较为平稳的转折点作为排泥结束点是经济的(实际运行中考虑安全因素适当加安全余量),可以建立原水浊度~排泥历时关系曲线,根据不同的原水浊度按相应的排泥历时控制排泥
问题补充:

  • 匿名
2013-05-23 12:21:38
The basic law of instructions to sludge water turbidity from the rapidly changing to a more stable end point of the turning point as the mud is the economy (the actual operation of appropriate safety factors to consider additional safety margin), raw water turbidity can create lasting relationships
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
The above basic rule showed that, from changes rapidly by the row of spate turbidity to a steadier turning point took the row of putty completion point is economical (in actual movement considered the safety factor suitable Canada safety margin), may establish the original water turbidity ~ row of p
  • 匿名
2013-05-23 12:26:38
Basic laws of these instructions, sludge water turbidity from rapid change to a more stable economy are the turning point as the sludge discharge end points (actual operation taking into account appropriate safety factors and security allowance), you can set up the raw water turbidity ~ sludge disch
  • 匿名
2013-05-23 12:28:18
The above-mentioned basic law explains, in order to arrange muddy water turbid degree by varying by comparatively steady turning point to as arranging rapidly it is economic (consider last piece safety factor last surpluses safe while operating to mud, can establish original water turbid degree arra
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭