当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The component model described above was applied in the CTCS-3 (China Train Control System Level 3) hardware-in-the-loop simulation platform. This platform simulates a line-level train control system and its running support environment. All signal equipments are as follows: 2 RBC (Radio Block Center), 11 TCC (Train Cont是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The component model described above was applied in the CTCS-3 (China Train Control System Level 3) hardware-in-the-loop simulation platform. This platform simulates a line-level train control system and its running support environment. All signal equipments are as follows: 2 RBC (Radio Block Center), 11 TCC (Train Cont
问题补充:

  • 匿名
2013-05-23 12:21:38
以上所述的组件模型应用在CTCS - 3(中国列车控制系统3级)硬件在环仿真平台。该平台模拟线路电平的列车控制系统及其运行支持环境。所有的信号设备如下:2 RBC(座中心电台),11 TCC(列车控制中心),白细胞介素5(联锁系统)和几个ATP(列车自动
  • 匿名
2013-05-23 12:23:18
上文所述的部分模式是应用在验车服务-3(中国列车控制系统一级3)硬件---Loop模拟平台。 这一平台模拟一线级列车控制系统及其运行支持环境。 所有信号设备如下:2名加拿大皇家银行(无线电座中心),11个部队派遣国(列车控制中心),5日(起动连锁系统)和几个ATP(自动列车
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
上文所述的组件模型是在验车-3 (中国列车控制系统级别 3) 半实物仿真平台中的应用。这个平台可以模拟线级列车控制系统和其运行的支持环境。所有信号设备都如下所示: 2 红细胞 (无线电块中心),11 TCC (列车控制中心),5 IL (联锁系统) 和几个 ATP (自动列车
  • 匿名
2013-05-23 12:28:18
如上所述的零部件模型被在CTCS-3里使用(中国火车控制系统级3)硬件在环里的模拟站台。这站台模拟一个线路级别训%
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭