当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Authority (MA). Radio Block Center (RBC) transmits MA message to Automatic Train Protection (ATP) equipment on board. After receiving a MA, ATP equipment on board calculates an appropriate speed and the train operates within the distance specified in MA. Before the train operates to the end of distance range authorized是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Authority (MA). Radio Block Center (RBC) transmits MA message to Automatic Train Protection (ATP) equipment on board. After receiving a MA, ATP equipment on board calculates an appropriate speed and the train operates within the distance specified in MA. Before the train operates to the end of distance range authorized
问题补充:

  • 匿名
2013-05-23 12:21:38
管理局(马)。收音机座中心(RBC)列车自动防护(ATP)车载设备传输马消息。接受一个硕士,ATP设备在船上后计算出一个适当的速度和马在指定的距离内列车运行。在列车运营硕士授权的距离范围,它应该会收到
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
当局(MA)。 无线电块中心(RBC)在船上传达MA消息给自动火车保护(ATP)设备。 在接受一MA以后, ATP设备在船上计算适当的速度,并且火车经营在MA指定的距离之间。 在火车经营对MA之前批准的距离范围的末端,它应该接受a
  • 匿名
2013-05-23 12:26:38
管理局 (马)。无线电块中心 (RBC) 传输到船上的列车自动保护 (ATP) 设备的马消息。接到马,船上 ATP 设备计算以适当的速度和火车在马中指定的距离的范围内操作。火车运行到授权的马的距离范围的结尾之前,它应接收
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭