当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:本线自LAC铁矿西侧编组站至港口站,线路正线全长816km。全线共布设车站18处。其中编组站1处,设有机务段1处和车辆段1处,会让站16处,港口站1处。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本线自LAC铁矿西侧编组站至港口站,线路正线全长816km。全线共布设车站18处。其中编组站1处,设有机务段1处和车辆段1处,会让站16处,港口站1处。
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
Since this line LAC iron ore formations West Side station to port terminal line, the line is 816 km length. The station's entire line 18. The marshalling yard, Pingdingshan Steam Depot 1 1 Department offices and vehicle 1 of paragraph 16 the site, will allow the port terminal, 1.
  • 匿名
2013-05-23 12:24:58
This line from LAC iron ore west side marshalling yard to harbor station, line main line span 816km.The entire line altogether builds station 18.Marshalling yard 1, is equipped with mechanical section 1 with vehicles section 1, can let station 16, the harbor stand 1.
  • 匿名
2013-05-23 12:26:38
This line from West marshalling station LAC iron ore to the port station, lines are line duration is 816km. All 18 total arrangement of the station. Marshalling station 1, with 1 of locomotive Depot and Depot 1, 16, 1 port station.
  • 匿名
2013-05-23 12:28:18
The station to the port of marshalling yard in the west of LAC iron ore of this line, circuit straight line total length 816km. Lay the station 18 together completely. Marshalling yard 1 place among them, have 1 of locomotive depot and rolling stock section 1 place, will let stand 16, one stands at
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭