当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:具体是做好二算编制工作及对比工作,对收到设计变更、技术核定单、资料等进行增减预算编制。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
具体是做好二算编制工作及对比工作,对收到设计变更、技术核定单、资料等进行增减预算编制。
问题补充:

  • 匿名
2013-05-23 12:21:38
Count is to do two specific preparation and contrast work, receive design changes, approved by a single technology and materials to increase or decrease in budget preparation.
  • 匿名
2013-05-23 12:23:18
Specifically, the budget formulation work 2 do a good job, and in contrast to work received approved changes of design, technology, information, and other changes in budget preparation.
  • 匿名
2013-05-23 12:24:58
Concrete is completes two calculated the establishment works and contrasts the work, to receives the design change, the technical nuclear order form, the material and so on carries on the fluctuation budget establishment.
  • 匿名
2013-05-23 12:26:38
Specific is good is the second compilation and comparison work, received design changes such as approved, technology, information changes in budgeting.
  • 匿名
2013-05-23 12:28:18
Do well two regard as documentation and compare with work, authorize single, material,etc. increase and decrease the budget to work out receiving design alteration, technology specifically.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭