当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:为防止百年洪水冲刷、浸泡路基边坡,根据河水流速、流量、百年洪水位及河流形态等具体情况,采用墁石基础干砌片石护坡、脚墙基础浆砌片石护坡等直接防护措施,防护高度为河水百年设计洪水位+波浪侵袭高+壅水高+0.5m(安全值)。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
为防止百年洪水冲刷、浸泡路基边坡,根据河水流速、流量、百年洪水位及河流形态等具体情况,采用墁石基础干砌片石护坡、脚墙基础浆砌片石护坡等直接防护措施,防护高度为河水百年设计洪水位+波浪侵袭高+壅水高+0.5m(安全值)。
问题补充:

  • 匿名
2013-05-23 12:21:38
To prevent the century flood, erosion, soak the embankment slope, according to river flow, flow, flood and river morphology century such circumstances, the use of plaster based dry stone revetment stone puzzle piece, the foot-based mortar rubble revetment wall and other direct protective measures, a
  • 匿名
2013-05-23 12:23:18
For the purpose of preventing 100 year flood washed roadbed, dipping slope as soon as possible, in accordance with river water, traffic flow, 100 years, such as flood and river patterns used in specific circumstances plastered dry first stone foundation kataishi slope protection, foot stone wall bas
  • 匿名
2013-05-23 12:24:58
In order to prevent hundred year flood washouts, the immersion roadbed side slope, according to the river water speed of flow, the current capacity, hundred years flood level and the rivers shape and so on the special details, uses lays bricks the stone foundation to build the slabstone slope protec
  • 匿名
2013-05-23 12:26:38
Centennial flood washed, soaked in order to prevent roadbed side slope, according to the centennial flood water level and flow rate, flow, river of the River forms in specific situations, pave floor with bricks or stones dry RIPRAP slope protection, foot masonry stone foundation walls made of stone
  • 匿名
2013-05-23 12:28:18
To prevent the flood for a century to erode, soak the slope by the road bed, according to the river flow rate, flowrate, detailed conditions such as the location of flood and fluvial morphology,etc. of a century, adopt pave stone foundation do build blocks of stone bank protec
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭