当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:1、后续新款产品货版同时生产时,打样工程师通知现场QC进行检验。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
1、后续新款产品货版同时生产时,打样工程师通知现场QC进行检验。
问题补充:

  • 匿名
2013-05-23 12:21:38
1, the follow-up version of the new products while goods production, proofing notice on-site QC engineers to test.
  • 匿名
2013-05-23 12:23:18
New paragraph 1, follow-up product version while production at the scene, with design engineers QC notice for inspection.
  • 匿名
2013-05-23 12:24:58
When 1st, the following new style product goods version simultaneously produces, pulls engineer to inform scene QC to carry on the examination.
  • 匿名
2013-05-23 12:26:38
1, subsequent new versions of domestic production at the same time, proofing field QC engineer referred for testing.
  • 匿名
2013-05-23 12:28:18
1, The subsequent new products goods edition draw a design the engineer tells on-the-spot QC to examine at the time of the production at the same time.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭