当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:待安装与已安装卡簧的转子必须分两个盛器摆放是什么意思?

待解决 悬赏分:1 - 离问题结束还有
待安装与已安装卡簧的转子必须分两个盛器摆放
问题补充:

  • 匿名
2013-05-23 12:21:38
Be installed with the rotor retainer must be installed in two containers placed
  • 匿名
2013-05-23 12:23:18
To be installed with the installed card killed the rotor must be divided into two containers placed
  • 匿名
2013-05-23 12:24:58
Waits the installment with to install the circlip the rotor to have to divide two vessel places
  • 匿名
2013-05-23 12:26:38
Installation with the installed rotor snap spring must be placed in two containers
  • 匿名
2013-05-23 12:28:18
Treat installation with install card rotor of reed must divide two vessels put already
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭