当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:MSE wall panels with pigment additive and architectural patterns as detailed on specifications.Contractor to include all costs required for the preparation of design drawing and approval from the Engineer, all cast in attachments and steel reinforcement是什么意思?

待解决 悬赏分:1 - 离问题结束还有
MSE wall panels with pigment additive and architectural patterns as detailed on specifications.Contractor to include all costs required for the preparation of design drawing and approval from the Engineer, all cast in attachments and steel reinforcement
问题补充:

  • 匿名
2013-05-23 12:21:38
MSE的墙上面板,色素添加剂和specifications.Contractor详细的建筑模式,包括从工程师,附件中的所有演员和钢筋的设计图纸和批准的编制所需的一切费用
  • 匿名
2013-05-23 12:23:18
微型和小型企业墙板与颜料添加剂和建筑格局,在详细规格承建商,包括所有费用所需的筹备设计绘图和批准的工程师,所有领衔主演的附件及钢筋
  • 匿名
2013-05-23 12:24:58
MSE墙板与颜料添加剂和建筑样式如详述在规格。包括所有费用的承包商需要为设计图和认同从工程师,全部的准备在附件和钢增强熔铸了
  • 匿名
2013-05-23 12:26:38
MSE 墙板色素添加剂和详细规格的建筑模式。承建商的设计图纸和批准从工程师,准备所需的所有费用都包括所有附件中投和钢加固
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭