当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Because the final product of this process is a building the operator has to run as a hotel,the architect's experience in designing hotels his or her experience with the prototype drawings of the franchise selected ,the fee ,and his or her no-time record must be considered是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Because the final product of this process is a building the operator has to run as a hotel,the architect's experience in designing hotels his or her experience with the prototype drawings of the franchise selected ,the fee ,and his or her no-time record must be considered
问题补充:

  • 匿名
2013-05-23 12:21:38
由于最终产品的这个过程,是建筑物的运营商已经运行作为一个酒店,建筑师的设计酒店的经验她的选择的特许经营的原型图纸经验,的费用,以及他或她没有,时间记录必须被视为
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭