当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Allow for Design and build of temporary drainage system to accommodate and divert required flows. The work includes design and construction of complete temporary drainage system approved by PWA,including emergency flood areas (EFA), pipes, inlets, manholes, gullies, pump stations, connection with existing drainage syst是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Allow for Design and build of temporary drainage system to accommodate and divert required flows. The work includes design and construction of complete temporary drainage system approved by PWA,including emergency flood areas (EFA), pipes, inlets, manholes, gullies, pump stations, connection with existing drainage syst
问题补充:

  • 匿名
2013-05-23 12:21:38
允许临时排水系统的设计和建设,以适应和转移所需的流动。这项工作包括PWA的批准,包括紧急水灾地区全民教育(EFA),管道,进气口,沙井,沟渠,泵站,与现有的排水系统,清除排水系统(停产,拆除)和完整的临时排水系统的设计和施工恢复现有的服务和面积等所有图纸上详细的完整。
  • 匿名
2013-05-23 12:23:18
使设计和兴建的临时排水制度以适应所需流动和转移。 这项工作包括设计和建造完成的临时渠务系统的核准Pwa、包括紧急水灾地区(全民教育)、喉管、进水口、人孔、沟渠、泵站、连接与现有的渠务系统、拆除(中止和拆除)的渠务系统和恢复的现有的服务和该地区等。 所有完成详细的关于dwg.
  • 匿名
2013-05-23 12:24:58
考虑到临时排水系统设计和修造容纳和牵制必需的流程。 工作包括PWA,包括紧急情况的水灾地区(EFA),管子、入口、出入孔、沟壑、泵浦与现有的排水系统的驻地、连接,现有的服务和区域等的撤除(被中断和折除)排水系统和复原批准的完全临时排水系统的设计和建筑。 所有完全如详述在Dwg。
  • 匿名
2013-05-23 12:26:38
允许设计和生成的临时排水系统以适应并转移所需的流动。工作包括批准的爱滋病患者,包括应急度汛区 (普及教育)、 管道、 入口、 沙井、 沟、 水泵站,与现有的排水系统,去除 (中止和拆除) 连接的排水系统和现有的服务和地区等所有完整详细对 Dwg 复职的完整的临时排水系统的设计与施工。
  • 匿名
2013-05-23 12:28:18
考虑到设计并且建造暂时排泄系统容纳并且转向要求流动。作品包括设计和结构完成PWA赞成的暂时的排泄系统,包括紧急事件洪水地区(EFA),管,进口,人孔,水冲沟,抽车站,联系,随着现有排泄系统,排除(中断并且拆卸)排泄系统和复原的并非全部都完成的这现有服务和地区等等作为详细在Dwg上。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭