当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:同时参与船舶产品,大型钢结构(如坞门,吊机,登船塔)等的前期设计论证及后续的跟踪工作是什么意思?

待解决 悬赏分:1 - 离问题结束还有
同时参与船舶产品,大型钢结构(如坞门,吊机,登船塔)等的前期设计论证及后续的跟踪工作
问题补充:

  • 匿名
2013-05-23 12:21:38
Also involved in shipping products, large-scale steel structure (such as dock doors, hoists, boarding towers) and other pre-design feasibility studies and follow-up work
  • 匿名
2013-05-23 12:23:18
participate at the same time, large-scale steel products (such as ship docks, hoists, boarding gate Tower, etc. ) the preliminary design and proof of tracking and follow-up work
  • 匿名
2013-05-23 12:24:58
Simultaneously participates in the ships product, the large-scale steel structure (for example shipyard gate, crane, goes on board tower) and so on the earlier period design verification and the following track work
  • 匿名
2013-05-23 12:26:38
At the same time involved in shipping products, large steel structures (such as dock doors, cranes, ship Tower) preliminary design demonstration and subsequent tracking of work
  • 匿名
2013-05-23 12:28:18
Participate in the shipping products at the same time, design proving and subsequent following work in large-scale steel construction (such as the door of depressed place, the hanging machine, embark in the tower),etc. earlier stage
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭