当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在测量中,工程施工过程中,由于采用了不同的坐标系,需要不同坐标系之间的坐标转换。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在测量中,工程施工过程中,由于采用了不同的坐标系,需要不同坐标系之间的坐标转换。
问题补充:

  • 匿名
2013-05-23 12:21:38
In the measurement, the construction process, the use of different coordinate system, need to coordinate between different coordinate system conversion.
  • 匿名
2013-05-23 12:23:18
In surveys, engineering construction, the use of different coordinate system, there is a need to convert the coordinates between different coordinate system.
  • 匿名
2013-05-23 12:24:58
In survey, in project construction process, because has used the different coordinate system, needs between the different coordinate system the coordinates transformation.
  • 匿名
2013-05-23 12:26:38
In surveying, construction process, as a result of the different coordinate systems, you need to coordinate transformation among different coordinate systems.
  • 匿名
2013-05-23 12:28:18
In the measurement, in the construction course, because of adopting different coordinate systems, need the coordinate between different coordinate systems to change.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭