当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:承包人应在每个月月底向工程师提交一份标了价的关于所用的劳力、材料和设备的报告。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
承包人应在每个月月底向工程师提交一份标了价的关于所用的劳力、材料和设备的报告。
问题补充:

  • 匿名
2013-05-23 12:21:38
Contractor should submit to the Engineer each month marked the end of the price on the use of labor, materials and equipment reports.
  • 匿名
2013-05-23 12:23:18
Contractors should be the end of each month engineers to submit a bid on the price of the labor, materials and equipment used in the report.
  • 匿名
2013-05-23 12:24:58
The contractor should in every month the bottom submit a sign price in each to engineer about the labor force, the material and the equipment report which used.
  • 匿名
2013-05-23 12:26:38
The contractor shall submit to the engineer at the end of each month a copy of the standard price of labour, materials and equipment used on the report.
  • 匿名
2013-05-23 12:28:18
The contractor shall submit to the engineer at the end of each month a copy of the standard price of labour, materials and equipment used on the report.
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭