当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:This phase of work consists of a research and development facility, Building N, a central utility plant expansion, Building A, and a parking structure, Building C. The parking structure is being designed and constructed as a separate project and is not included as a part of this report.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
This phase of work consists of a research and development facility, Building N, a central utility plant expansion, Building A, and a parking structure, Building C. The parking structure is being designed and constructed as a separate project and is not included as a part of this report.
问题补充:

  • 匿名
2013-05-23 12:21:38
[object Object]
  • 匿名
2013-05-23 12:23:18
本阶段的工作包括一个研究和发展设施,建设n、一个中央公用设备厂扩大,建设一个,一个停车场结构、C楼的停车场结构正在设计和建造作为一个单独的项目,是不包括在本报告的一部分。
  • 匿名
2013-05-23 12:24:58
这个阶段工作包括对研究与开发设施,修造的N,到中央公共植物扩展,修造对和对停车处结构,楼C。 停车处结构被设计并且被修建至于被分离的项目并且不是包括的作为这个报告一部分。
  • 匿名
2013-05-23 12:26:38
这一阶段的工作包括研究和开发设施,楼中央实用程序厂的扩产,建筑,和停车收费结构,建立 c.停车收费结构是在设计和建造作为单独的项目,而不是作为本报告的一部分包括在内。
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭