当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:To provide a vibration isolation structure capable of easily setting a natural period of a building without being influenced by ground conditions. ! The building 10 is supported by steel pipe piles 14 driven into the ground through link members 16. Therefore, when the building 10 starts falling down, the building 10 ha是什么意思?

待解决 悬赏分:1 - 离问题结束还有
To provide a vibration isolation structure capable of easily setting a natural period of a building without being influenced by ground conditions. ! The building 10 is supported by steel pipe piles 14 driven into the ground through link members 16. Therefore, when the building 10 starts falling down, the building 10 ha
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
提供一种震动隔离结构能够很容易确定一个自然的期间的建设而不受地面条件。 ! 10日的建设是支持由钢喉管桩14驱动在地上通过联系成员16. 因此,在建设10开始下跌,有无限的建设10期。
  • 匿名
2013-05-23 12:24:58
提供隔振结构能容易设置大厦的一个固有周期没有被地面条件被影响。 ! 钢管堆支持楼10 14被驾驶到地面通过链接成员16。 所以,当楼10开始跌倒时,楼10有一个无限期间。 楼10连接到一个地下坑22用恢复春天24,并且正面坚硬被给楼10举行位置联系在楼10和钢管堆14之间。 由宪法,改变将被测量的巨大弹力自由地导致必需的坚硬,并且可以自由地设置楼10的固有周期。 一个阻止的设备30提供在楼10和地下坑22之间,并且地震能量被吸收迅速阻止楼10的振动。 ! (C) 2003年, JPO
  • 匿名
2013-05-23 12:26:38
提供能够轻松设置不受地面条件的建筑物的固有周期隔震结构。!建设 10 支持的钢管桩打入地面通过链接成员 16 14。因此,当建设 10 开始倒下来了,建设 10 个具有无限期。建设 10 连接到地下基坑 22 恢复泉 24,和建设给予积极的刚性举行建设之间的位置关系 10 10 和 14 钢管桩柱。宪法 》,给予弹性力的大小更改为自由生产所需的刚度和建设自然期 10 可自由设定。10 和地下基坑 22,和地震能量吸收迅速抑制振动的建筑物之间建设提供阻尼器 30 10。!(C) 2003 年初级专业人员
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭