当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:3.线材加工艺加工较多,原来为5芯线,现在为8芯线,且咪线与喇叭地线需要分开且上锡,增加了好几道工序是什么意思?

待解决 悬赏分:1 - 离问题结束还有
3.线材加工艺加工较多,原来为5芯线,现在为8芯线,且咪线与喇叭地线需要分开且上锡,增加了好几道工序
问题补充:

  • 匿名
2013-05-23 12:21:38
3 wire plus processed more original five core wire, 8 wire, microphone wire and speaker ground needs to separate on the tin, an increase of several process
  • 匿名
2013-05-23 12:23:18
3.The wire the technological processing, and more for the original 5-cell line, and now the 8-cell line, and parking meters with horn lines need to line the tin, and separate from the operation several road
  • 匿名
2013-05-23 12:24:58
3. materials add the craft processing to be many, originally is 5 cores, now is 8 cores, also the onamot line and the loudspeaker grounding need to separate also on the tin, increased several working procedures
  • 匿名
2013-05-23 12:26:38
3. in wire and processing more, the original 5 wire, now for the 8-core lines, and cards on line and Horn on the ground need to be separated and Tin, adding several process
  • 匿名
2013-05-23 12:28:18
Wire outer covering
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭