当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:本文结合秦皇线改造工程的工程实践,采用最新《公路水泥混凝土路面设计规范》所述方法,对旧水泥混凝土路面进行了路面损坏状况调查评定、接缝传荷能力和板底脱空状况调查评定和路面结构参数调查是什么意思?

待解决 悬赏分:1 - 离问题结束还有
本文结合秦皇线改造工程的工程实践,采用最新《公路水泥混凝土路面设计规范》所述方法,对旧水泥混凝土路面进行了路面损坏状况调查评定、接缝传荷能力和板底脱空状况调查评定和路面结构参数调查
问题补充:

  • 匿名
2013-05-23 12:21:38
In this paper, the Qin emperor Line reconstruction project engineering practice, using the latest cement concrete pavement design specification described in the method of survey assessment of the status of road damage on the old cement concrete pavement joint load transfer, and the end of the plate
  • 匿名
2013-05-23 12:23:18
This article is not online with Qin construction projects of engineering practice, the use of the latest portland cement concrete road surface design specifications, and of the method described in the old cement concrete pavement for a survey of the state road damage assessment, the seams and I woul
  • 匿名
2013-05-23 12:24:58
This article unifies Qin Huangxian to transform the project the project practice, uses newly "Road Cement Coagulation Earthen road pavement Design Standard" to state the method, carried on the pavement distress condition investigation evaluation, the joint to the old cement coagulation earthen road
  • 匿名
2013-05-23 12:26:38
Engineering practice of this article combined with the Emperor of Qin line reconstruction project, using the latest methods covered by the code for design of Highway cement concrete pavement, pavement on old cement concrete pavement damage survey and assessment, joint load capacity and slab and pave
  • 匿名
2013-05-23 12:28:18
Combination practice
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭