|
关注:1
2013-05-23 12:21
求翻译:甲方准备好搅拌站安装施工用电,接入点按图示位址是什么意思? 待解决
悬赏分:1
- 离问题结束还有
甲方准备好搅拌站安装施工用电,接入点按图示位址
问题补充: |
|
2013-05-23 12:21:38
Party ready for mixing plant installation and construction of electricity, the access point icon in address
|
|
2013-05-23 12:23:18
Party A shall be prepared by mixing station installation, access points (as shown here
|
|
2013-05-23 12:24:58
The party of the first part prepares to stir the station installment construction to use electricity, junction point according to graphical representation position site
|
|
2013-05-23 12:26:38
Party a ready mixing plant installation construction, illustration of access points by address
|
|
2013-05-23 12:28:18
Due to design defects, manufacturing defects of the product itself, installing defects caused by the fault, in the case of quality guarantee period is over, our company free maintenance
|
湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区