当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:甲方准备好搅拌站安装施工用电,接入点按图示位址是什么意思?

待解决 悬赏分:1 - 离问题结束还有
甲方准备好搅拌站安装施工用电,接入点按图示位址
问题补充:

  • 匿名
2013-05-23 12:21:38
Party ready for mixing plant installation and construction of electricity, the access point icon in address
  • 匿名
2013-05-23 12:23:18
Party A shall be prepared by mixing station installation, access points (as shown here
  • 匿名
2013-05-23 12:24:58
The party of the first part prepares to stir the station installment construction to use electricity, junction point according to graphical representation position site
  • 匿名
2013-05-23 12:26:38
Party a ready mixing plant installation construction, illustration of access points by address
  • 匿名
2013-05-23 12:28:18
Due to design defects, manufacturing defects of the product itself, installing defects caused by the fault, in the case of quality guarantee period is over, our company free maintenance
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭