当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:在PBS的基础上,将项目行为系统分解成互相独立、互相影响、互相联系的工程活动,分解的结果成为工作分解结构(WBS)是什么意思?

待解决 悬赏分:1 - 离问题结束还有
在PBS的基础上,将项目行为系统分解成互相独立、互相影响、互相联系的工程活动,分解的结果成为工作分解结构(WBS)
问题补充:

  • 匿名
2013-05-23 12:21:38
Pbs the basis of the project behavior system is broken down into independent of each other, interact with each other engineering activities, the decomposition result of the work breakdown structure (wbs)
  • 匿名
2013-05-23 12:23:18
On the basis of the PBS project, will be broken down into system acts independently of each other, affecting each other, and linked by an engineering activities, resulted from the breakdown of the decomposition (WBS structure)
  • 匿名
2013-05-23 12:24:58
In the PBS foundation, decomposes independently the project behavior system, the mutual influence, the mutual connection project activity, the decomposition becomes mutually work decomposition structure (WBS)
  • 匿名
2013-05-23 12:26:38
Based on the PBS, the project system is broken down into separate project activities, mutual influence and mutual ties, decomposition of the results of a work breakdown structure (WBS)
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭