求翻译:The Contractor shall ensure that the passage of any vehicle or plant over the partially or fully completed layer does not cause any rutting or other damage or disturbance to the layer, and should such rutting or damage or disturbance occur, the Contractor shall repair it as directed by the Engineer, all at the Contract是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The Contractor shall ensure that the passage of any vehicle or plant over the partially or fully completed layer does not cause any rutting or other damage or disturbance to the layer, and should such rutting or damage or disturbance occur, the Contractor shall repair it as directed by the Engineer, all at the Contract
问题补充:

  • 匿名
2013-05-23 12:21:38
承建商须确保任何车辆或以上的部分或全部完成层植物的推移,不会造成任何车辙或其他损害或干扰层,应该发生这样的车辙或损坏或干扰,承包商应修复它作为指导由工程师,承包商自费。
  • 匿名
2013-05-23 12:23:18
该承建商须确保所通过的任何车辆或植物在部分或全部完成层不会导致任何吕廷或其他损害或骚扰,这层,并应这种吕廷或损害或骚扰发生,该承建商须修复它指导的工程师,所有在承包商的费用。
  • 匿名
2013-05-23 12:24:58
承包商保证任何车段落或植物在部份地或充分地完整层数不导致任何rutting的或其他损伤或干扰到层数,并且应该这样rutting或损伤或干扰发生,承包商将修理它如是由工程师,所有指挥的为了贬低承包商的自己的。
  • 匿名
2013-05-23 12:26:38
通过任何车辆或通过部分或完全填妥层植物不会导致任何车辙或其他损坏或干扰对图层,并应发生这种车辙或损害或干扰,承建商不得修复它的工程师都在承建商的费用按指示,须确保承建商。