求翻译:None of the foregoing provisions shall prevent the Engineer from requiring the Contractor to vary his plant or methods at any time during the execution of the Works, should this be Notwithstanding the Engineer’s approval of the Contractor’s plant and methods, the Contractor shall at all times be solely responsible for 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
None of the foregoing provisions shall prevent the Engineer from requiring the Contractor to vary his plant or methods at any time during the execution of the Works, should this be Notwithstanding the Engineer’s approval of the Contractor’s plant and methods, the Contractor shall at all times be solely responsible for
问题补充:

  • 匿名
2013-05-23 12:21:38
没有上述规定应防止要求承包商以不同随时工程的执行过程中他的植物或方法的工程师,应该这是尽管工程师的批准承包商的工厂和方法,承包商在任何时候都应当是只负责建设,按照规范和图纸的碎石层。
  • 匿名
2013-05-23 12:23:18
但上述规定并不阻止该工程师从要求承建商可更改其厂房或方法在任何时间在工作进行期间,如果这是尽管工程师的批准的承包商的植物和方法,承包者应在所有时间只负责兴建的碎石层按照规格及图样。
  • 匿名
2013-05-23 12:24:58
前面供应都不会防止工程师要求承包商任何时候变化他的植物或方法中工作的施行,如果这是仍然承包商的植物和方法的工程师的认同,承包商一直将负责单一地对修建被击碎的石层数与规格和图画符合。
  • 匿名
2013-05-23 12:26:38
无前述条文须防止从要求承建商更改他的植物或方法的作品,在执行期间的任何时候,工程师应这是承建商的植物和方法尽管工程师批准,承包者应在所有时刻必须独自负责构建碎石结构的层按照规范和图纸。
  • 匿名
2013-05-23 12:28:18
最低干密度 (%MDD) (航路 S1)
 
 