当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:As described in the theoretical framework the existence of a one-piece flow and reduction of inventories are highly dependent on using small batches of products.To identify the possibilities to use low batch sizes in the current remanufacturing process, the current EOQ has been calculated.The EOQ for the different cart是什么意思?

待解决 悬赏分:1 - 离问题结束还有
As described in the theoretical framework the existence of a one-piece flow and reduction of inventories are highly dependent on using small batches of products.To identify the possibilities to use low batch sizes in the current remanufacturing process, the current EOQ has been calculated.The EOQ for the different cart
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
如所描述在理论框架存货的单件流程和减少的存在依靠高度使用小批产品。要辨认可能性使用低批量在当前重新生产过程,当前EOQ被计算。EOQ为不同的弹药筒排列在20之间对140.One主要评论家由精瘦的实践,当使用经济定货量计算批量时是费用为命令准备(设置成本等等)被认为固定。 分析在命令费用的原因没有被找到与机器设定连接如共同地被发现传统上制造。 二之间的主要区别是重新生产过程的低自动化水平在main.reasons为存在oforder费用是费用为materal处理的Scandi-Toner.Instead,作为带来拆取和例如sparepartsferom存贮对assemblylines。在运输透视
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭