当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:所有星轮是用螺钉固定在星轮座上的。安装导瓶板时必须注意与星轮间的间隙,一般控制在瓶直径D+1~1.5mm左右。每对星轮及导瓶板安装时保证处于同一水平面上,调整星轮同步时,先松开螺钉,转动星轮座,调整好后锁紧螺钉。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
所有星轮是用螺钉固定在星轮座上的。安装导瓶板时必须注意与星轮间的间隙,一般控制在瓶直径D+1~1.5mm左右。每对星轮及导瓶板安装时保证处于同一水平面上,调整星轮同步时,先松开螺钉,转动星轮座,调整好后锁紧螺钉。
问题补充:

  • 匿名
2013-05-23 12:21:38
All star wheel star wheel base with screws. Install guide bottles board, should be noted that the gap between the star wheel, the general control around the bottle diameter d +1 ~ 1.5mm. Each pair of star wheels and guide bottles board installation to ensure at the same level, adjust the star wheel
  • 匿名
2013-05-23 12:23:18
All-star round screw is used on the block, the Star Ferry. When you install ABM bottle GEM must be noted with the gap between Star Ferry and the general control of the bottle D + 1 ~1.5 mm diameter. The Star Ferry and ABM bottles each gem installation, ensure that is on the same horizontal adjustmen
  • 匿名
2013-05-23 12:24:58
All spiders are with screw retention in the spider place.The installment leads when the bottle board must pay attention to and the spider gap, general control about bottle diameter D+1~1.5mm.Every time and leads to the spider the bottle board installs when guaranteed is in the identical horizontal p
  • 匿名
2013-05-23 12:26:38
All Star wheels are fixed with screws on the star wheel. Installation Guide bottle must be kept in mind while with clearance between star wheels, general control on the bottle about D+1~1.5mm in diameter. Each pair of Star wheel and bottle installation guarantees when you are on the same horizontal
  • 匿名
2013-05-23 12:28:18
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭