求翻译:要承担生产剥离矿(岩)石铲装,平均小时生产率1320m3∕h,每天两班倒作业,每班实际作业9小时,每天作业18小时,可完成工作量23760m3是什么意思?

待解决 悬赏分:1 - 离问题结束还有
要承担生产剥离矿(岩)石铲装,平均小时生产率1320m3∕h,每天两班倒作业,每班实际作业9小时,每天作业18小时,可完成工作量23760m3
问题补充:

  • 匿名
2013-05-23 12:21:38
Production stripping ore (rock) to bear the stone shovel, average hourly productivity of 1320m3 h, two shifts a day job, the actual operation of nine hours per class, operating 18 hours a day, to be completed by the workload of 23760m3
  • 匿名
2013-05-23 12:23:18
It is necessary to assume production stripping stone shovels mining (rock) 1320 installed, the average hourly productivity562H m 3 per day, operating two shifts per class, 9 hours, actual operating 18 hours a day, and can be completed operations workload 23,760 m 3
  • 匿名
2013-05-23 12:24:58
Must undertake the production peeling ore (crag) Shi Chanzhuang, average hour productivity 1320m3∕h, daily double-shift work work, each class of actual work 9 hours, daily work 18 hours, but fulfil working quotas 23760m3
  • 匿名
2013-05-23 12:26:38
To take up production split mine (Rock) rock shovel mounted, average hourly productivity 1320m3 territory h, two shifts a day job, real jobs 9 hours per class, working 18 hours a day, you can work 23760m3
  • 匿名
2013-05-23 12:28:18
null
 
 