当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:小船靠泊并与装船臂对接后,LNG通过新增低压泵加压后,经支管汇集到总管输送至码头装料臂对小船进行装料。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
小船靠泊并与装船臂对接后,LNG通过新增低压泵加压后,经支管汇集到总管输送至码头装料臂对小船进行装料。
问题补充:

  • 匿名
2013-05-23 12:21:38
Boat berthing and docking with the loading arm, lng, which is pressurized by new low-pressure pump, the branch pipe collection Explorer transported to the terminal loading arm on the boat loading.
  • 匿名
2013-05-23 12:23:18
small boat docked at loading the boat and with his arm, after docking LNG through new low pressure pump pressure, after the pool to the mains supply to terminal arm 1,153,200 to 1,153,200 for small boats.
  • 匿名
2013-05-23 12:24:58
The boat anchors and after shipment arm docking, LNG after increases the low press pump compression, collects the main pipe after the branch to transport to the wharf feeds the arm to carry on to the boat feeds.
  • 匿名
2013-05-23 12:26:38
After the boat berthing and docking with the arms shipment, after LNG through low pressure pumps pressure through pipes assembled into common bile duct to the boat dock loading arm to be charging.
  • 匿名
2013-05-23 12:28:18
null
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭