当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:可以通过研究打桩过程中超静孔隙水压力的变化,推导桩基承载力的变化,结合实测曲线方法得到的初始桩基承载力,从而得到桩基极限承载力。是什么意思?

待解决 悬赏分:1 - 离问题结束还有
可以通过研究打桩过程中超静孔隙水压力的变化,推导桩基承载力的变化,结合实测曲线方法得到的初始桩基承载力,从而得到桩基极限承载力。
问题补充:

  • 匿名
2013-05-23 12:21:38
Piling process Super pore water pressure changes through research, to derive the changes of the pile foundation, combined with the measured curves approach the initial pile foundation, resulting in the pile ultimate bearing capacity.
  • 匿名
2013-05-23 12:23:18
Through research piling in the process of super-ching-pore pressure changes piling derivation, endurance, combined with the CCIR curve changes from the initial piling method, and thus gained piling endurance limit endurance.
  • 匿名
2013-05-23 12:24:58
May cut in line the process superior static pore-water pressure change through the research, the inferential reasoning pile foundation supporting capacity change, the initial pile foundation supporting capacity which the union actual curve method obtains, thus obtains the pile foundation limit suppo
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
null
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭